-
Продукты
- Washing of CRATES and TRAYS
- Washing of BINS
- Washing of PALLETS
- Washing of CONTAINERS and TANKS
- Washing of SEEDBED TRAYS
- Washing of CHEESE MOULDS
- Washing and drying of BREAD and PASTRY MOULDS
- Washing of CHOCOLATE MOULDS
- Washing of CARTS, PERCHES, SHELVES, HAMS AND SAUSAGES
- Washing of POULTRY CAGES
- Washing of TINS, JARS and PACKAGES
- Washing of CANS
- Washing of FEEDING BOTTLES and UTENSILS
- Washing of RACKS-CAGES
- Washing of PREFORM CONTAINERS
- Washing of HAMS AFTER SALTING
- Отрасли применения
-
Pеше́ние
-
Тунели Для Мойки
- CRATE washers (small production) · M-0
- CRATE washers (medium-size production) · M-1 and M-2
- CRATE washers (medium-size production) · M-2/L
- CRATE washers (large productions) · E
- HAMS AFTER SALTING washers · M-0/J
- BINS washers (medium-size productions) · PA
- CHEESE MOULDS washers · M-2/C/Q
- PALLETS washers (small productions) · M-1/PL
- OVERHEAD washers · G
- SEEDBED TRAYS washers · SE
- Моечные Шкафы
- Тунели сушки
- Тунели мойки и сушки
- Полные линии
- Акссесуары
-
Тунели Для Мойки
- Видео
DINOX QUALITY
................................................................................................................................
The special attention we give to every detail of the construction of our equipment has led us to offer solutions tailored to each customer, convinced that it is the only way to achieve optimal washing quality
PHASE 1 . Information request We ask for a lot of information. Measurements, photos, available space, dirt to wash... all the details will help the correct approach of the equipment ........................................ PHASE 2 . Proposal With the above information, we are ready to make an initial project including a technical and economic description and a layout, our OFFER ........................................ PHASE 3 . Production Once the equipment has been agreed, we start production: laser, raw material purchases, assembly, construction, electrical system,... everything necessary realize the equipment. For us it is important that the client participates in the tests of the equipment (FAT). It allows us to ensure proper operation before leaving our facilities ........................................ PHASE 4 . Facility The installation is as short as possible so as not to interfere with the client's production. The equipment has already been tested and transported whole or in the minimum number of possible modules
|
................................................................................................................................

QUALITY
Details of excellence and precision. We never settle for the best

ADAPTATION
We adapt to the needs of each customer

SIMPLICITY
Quality material and work well done, pillars of our projects

CONFIDENCE
We take care of the relationship with our customers, suppliers and staff, just as we take care of our machines
-
Dinox
Zona Industrial Pont-Xetmar, Carrer C, 16-18
17844 Cornellà del Terridinox at dinox dot es